Toronto Metropolitan University
Browse
Peesapati, Sreesuryasai Santosh Sarma.pdf (472.25 kB)

The supplier–buyer integrated production–inventory model with random yield, scrapping, and discounting sales

Download (472.25 kB)
thesis
posted on 2022-05-25, 17:09 authored by Sreesuryasai Santosh Sarma Peesapati

This report provides four models for a single-buyer and single vendor inventory system for a single item to optimize the total cost of this supply chain system. Scrapping imperfect items at buyer’s and vendor’s locations and discounting imperfect items at buyer’s and vendor’s locations have been developed. The renewal-reward theorem has been used to calculate the expected total cost and expected replenishment cycle time. Conditions have been provided to adopt a particular model. A numerical example has been provided, sensitivity analysis has been performed to validate the theoretical results, and the input parameters affecting the total cost have been provided.


History

Language

English

Degree

  • Master of Engineering

Program

  • Mechanical and Industrial Engineering

Granting Institution

Ryerson University

LAC Thesis Type

  • MRP

Thesis Advisor

Mohamed Wahab Mohamed Ismail

Usage metrics

    Mechanical and Industrial Engineering (Theses)

    Exports

    RefWorks
    BibTeX
    Ref. manager
    Endnote
    DataCite
    NLM
    DC